Form Regional Water — Treating 90 million litres a day, quietly

Water Resources · 2024

Treating 90 million litres a day, quietly

Form Regional Water

90 MLD

Capacity

100%

Uptime

900 t

Concrete saved

Overview

Process and structural engineering for the expansion of a regional water reclamation plant.

The challenge

The plant had to keep treating flows during construction, and new tanks sat on a high water table that made buoyancy and differential settlement real risks.

Our approach

We phased the works so no basin ever went fully offline, designed the reactor tanks as jointed reinforced-concrete cells on a piled raft, and added permanent under-drainage to relieve hydrostatic uplift.

The outcome

Capacity rose by 40% with no discharge exceedances during the build. The uplift relief system cut the raft thickness and saved roughly 900 tonnes of concrete.